Have this ready before you call
The address and the tree's position on it. "Large gum in the back left corner, over the neighbour's shed" is worth more than a paragraph of description.
Photos. One from far enough back to show the whole tree and what surrounds it, one of the base and root collar, and one of the access route from the street to the tree. Those three photos answer most of what a contractor needs to know before they arrive.
The access facts. Driveway width and grade. Side gate width. Steps. Overhead wires across the frontage. Whether the street will take a truck and where it can park.
What you actually want. Removal, reduction, deadwooding, clearance off the roof, or "I do not know, tell me what it needs." All four are valid answers and the last one is honest.
Insist on a site visit
Nothing that matters can be assessed from a phone call. The condition of the stem and unions, the state of the root collar, what is under the tree, how far material has to be carried, whether the tree is protected — all of it needs someone standing there.
Site visits and written quotes are free. A contractor who wants to price from a description is either inexperienced or is planning to revise the number on the day.
What the written quote must contain
- Which trees, identified unambiguously.
- The method — fell, sectional dismantle, or crane — and why.
- The stump: included or not, ground or excavated, and to what depth.
- Waste: removed, or mulch left on site, or rounds stacked.
- Permits: whether the tree is protected, who lodges the application, who pays the fee, and what happens if it is refused.
- Reinstatement: what happens to turf, paving or garden damaged by access.
- Insurance: a current certificate of currency for public liability, in the name of the entity quoting.
- Price and variations: the total, and what would change it.
Comparing quotes properly
Lay them side by side on scope, not on total. The most common differences are the stump, waste removal, permit responsibility, and the method assumed.
A quote that is dramatically cheaper is usually cheaper because something is missing, because the operator has assumed a straight fell on a block that cannot take one, or because they are not carrying insurance. All three of those become your problem, not theirs.
Ask each contractor to explain why their method is what it is. The explanations will tell you which of them has actually looked at the site.
Warning signs
Door-knocking with "we were working nearby and have leftover material". Pressure to decide on the spot. Cash-only, full payment up front. No written quote. No insurance certificate. An unwillingness to discuss whether the tree is protected — the approval guide explains why that question matters and who wears the penalty.
And a proposal to "top" a healthy eucalypt, which is bad practice regardless of price — see when to trim versus when to remove.
Then check the extras
The hidden costs guide lists the line items that most commonly appear after the quote is accepted, and the pricing guide explains what is driving the number in the first place.
Frequently asked questions
What should a written tree removal quote include?
The specific trees identified by position or species, the method proposed, whether the stump is included and to what depth, whether waste is removed or left, who lodges any permit and who pays the fee, reinstatement of any damage caused by access, the total price and what triggers a variation, and evidence of current public liability insurance. Anything less is an estimate, not a quote.
How many quotes should I get?
Three is the usual advice and it is reasonable, provided you compare scope rather than just totals. Two quotes with identical scope and insurance are more useful than five that are all quoting different jobs. If one number is dramatically lower than the others, the reason is almost always something left out rather than a better price.
Should I pay a deposit?
A modest deposit on a large job is normal, particularly where a crane, traffic management or a permit fee has to be paid for in advance. A demand for full payment up front is not normal. Pay by a traceable method, get a receipt, and never pay cash in full before work starts to someone who knocked on your door unannounced.